Sunday, March 10, 2019

Capstone: Day-7


Week 7

Our group has finally reached out to Christian Mircom technician. He will assist on renewing the FX 2000 password by next week.

Today our group worked on installing phone panel and integrating third party devices to the OpenGN. First method we tried was connecting through Modbus with easy IO. In order to generate an XML code we needed to create a string to send to Open gateway. 

Another method was through in-suite, connecting to the OpenGN. In-suite needed POE switch to operate and we worked on installing in C527. We are still working on both methods.